PIPES & SPECIALS DOWNLOAD No
Brass -Stops Cocks, ferrules, Gate Valves etc. and Gunmetal - Ferrules etc. Click here..... 11
CI (Cast Iron Pipes & Fittings, Valves. Couplings, Adaptors) Click here..... 12
DI (Ductile Iron Pipes & Fittings, Valves, Couplings, Adaptors, Repair Clamps) Click here..... 13
GI (Galvanized Iron Pipes & Fittings, Flanges) Click here..... 14
HDPE (Pipes & Fittings)  Click here..... 15
Alkethine Pipe Click here....  16
Meters (Water meters, Flow meters) Click here..... 17
Plastic water tank etc. Click here..... 18
PVC Pipes & Fittings, Solvent Cement Click here.....  19
Stainless Steel Pipes & Fittings Click here.....  20
Steel Pipes & Fittings Click here.....

21

STATIONERY    
Computer Consumables (CD's, Ribbons, Cartridges, Toners)  Click here..... 22
Office and General Stationery/Papers (Computers, Photocopies) Pens, Clips, Punchers, Staplers, Toners, Master roles, etc., Click here..... 23
Stationery for Planning & Design/Plan printing paper, P/P Toner, Tracing Paper  Click here..... 24
EQUIPMENT    
Kitchen Utensils (Crockery, Cutlery, Water Filters, Cups & Soucers, Gllasses, Scales etc.) Click here..... 25
Office Equipment (Postal Franking Machines, Type writers, Spiral Binders, Roneo/Duplicating Machines GPS. Photocopiers, Fax Machines, Overhead Projectors) Click here..... 26
BUILDING CONSTRUCTION AND HARDWARE    
Building Materials (Bricks, Cement, Sand, Metal, Asbestos Sheets/Galvanized Sheets etc.) Click here..... 27
Sanitoryware (Wash basins, Taps, Commodes & Cisterns, Tiles etc.) Click here..... 28
Timber Materials (Rafters, Planks, Joists, Reefers) Click here..... 29
Constructon Equpment (Wheel barrows, hand carts, Paint and Paint brushes etc.) Click here..... 30
Fiber Glass Items Click here..... 31
Bolts & Nuts, M.S.Sheets, Tor Steels, Tarpaulin etc.  Click here..... 32
Safety Equipment, Fire Extinguishers, Gloves, Helmets, Raincoats, Gum Boots, Masks, Road Marker Tapes, Traffic Cones etc. Click here..... 33
ELECTRICAL, ELECTRONIC AND IT EQUIPMENTS    
Air Conditioners Click here..... 34
Electrical (Refrigerators, Kettles, Heaters, Water Boilers, Vaccum Cleaner, Wlwreical wires and other Accessories. Click here..... 35
Electronic(Calculaters, Adding Machines, Cash Registers, Finger Print Machine etc.) Click here..... 36
Telecommunication Equipments (Telephone systems, Mobile Phones and Key Telephones etc.,) Click here..... 37
Computer, Computer Peripherals(Printers, UPS), Servers, Software, Networking, Audio Visuals etc. Click here..... 38
TOOLS    
Mechanical - Welding Equipment & Accessories (Grinders, Diamond Cutting tool)  Click here..... 39
Adjustable spanners Transmission Jacks, pipes wrenches, Bench wise etc.
Electrical - (Hammer, Drills & Accessories, Cutting Pliers, Electronic - (Pneumatic, Screwdrivers, Soldering irons, disordering Tools etc.,)  Click here..... 40
LABORATORY EQUIPMENT, CHEMICAL & UTILITIES    
Filter Media - Graded Sand and Pebbles etc.  Click here..... 41
Laboratory Chemicals Equipment  Click here..... 42
Water Treatment Chemical (Aluminium Sulphate, Bleaching powder, Hydrated Lime, Bentonite Clay, Poly Aluminium Chloride). Activated Carbon and Polymer.  Click here..... 43
VEHICLES & MACHINERY, AUTOMOBILES    
Automobile Batteries  Click here..... 44
Mechanery Equipment & Material Handling Equipment & Spares Click here..... 45
Motor Spares & Accessories  Click here..... 46
Tyres & Tubes for vehicles
Click here.....
47
PUMPS, MOTORS & SPARES    
Pumps & water purification equipments, Spares for water pumps and bearings Click here..... 48
Hand Pumps and spares for hand pumps Click here..... 49
GENERAL PURPOSE    
Rubber Products - Packing, Rings, Hoses etc. Click here..... 50
Textile - Dusters & Towels /Flags etc. Click here..... 51
Toiletries (Soap, Disinfectants, etc.) Click here..... 52
FURNITURE & FITTINGS    
Furniture (Wooden) - Tables/Chairs/Cupboards/File Racks etc. Click here..... 53
Furniture (Steel, Plastic & Fiber Glass) - Tables/Chairs, Cupboards/Cabinets etc. Click here..... 54
SERVICES    
Building Construction/Repair/Maintenance Work Click here..... 55
Name Board Printing Click here..... 56
Welding Work Click here..... 57
Painting and Interior Decor (Vertical Blinds & Curtains etc.,) Click here..... 58
Light Weight Aluminum work (Partion work, Exterior Cladding Work, Enclosures, Doors, Windows etc.)  Click here..... 59
Hiring of Passenger Vehicles Click here..... 60
Hire of Heavy Mechinery (Back-hoes, Bull-dozers, Water bowsers) Click here..... 61
Printing of Water Bills etc. Click here..... 62
Printing and Allied Services Click here..... 63
Supply of Labour /Janitorial Service Click here..... 64
Surveying (Services) Click here..... 65
Civil Engineering Work (Laying of Pipes in water supply & severage work Construction of roads) Click here..... 66
 Vehicle - Repairs/Services/AC Repairs/Services/AC Repair/Cushion work Click here..... 67

ABBREVIATIONS Click here...

My No.: DGM/S/A1/18/2017


M/s . .................................
        .................................

Dear Sirs

RULES& REGULATIONS FOR REGISTERED SUPPLIERS TO SUPPLY MATERIALS TO NATIONAL WATER SUPPLY & DRAINAGE BOARD FOR THE YEAR 2017

The registered suppliers are requested to comply with the following rules and regulations stipulated by the National Water Supply & Drainage Board in respect of quotations.

  1. Quotation should be submitted under sealed cover. Quotation number, time and date of closing should be clearly indicated on the top left hand corner of the envelope. Please use separate covers for different quotation numbers. Quotations may be placed in the Box provided for the purpose at Supplies Section by Registered Post.
  2. Wherever the offered item is imported, the Country of Origin and Brand Name, if any must be indicated.
  3. Samples and literature of times offered, wherever applicable, shall be provided.
  4. Suppliers who fail to quote for three consecutive occasions in response to the enquiries, will be deleted from the Register of Suppliers.
  5. Normally, quotation will be called from the registered suppliers. But the Board reserves the right to obtain quotations from other suppliers as well whenever necessary.
  6. The Board reserves the right, to accept or reject any quotation in part or in full irrespective of whether prices are the lowest or not.
  7. Bid Bonds
    1. In the case of quotations where the value exceeds Rs. 100,000.00 a Bid Bond should accompany the quotation to the value of 1% - 2% of total value. Bid Bond should be valid for 90 days.
    2. Collective Bid Bonds are permitted provided supplier agrees to such Bonds being retained by the Board until all the quotations covered by such Bonds are finalized.
    3. However, collective Bid Bonds should not be sent in respect of quotations where closing dates fall on different dates.
    4. As soon as quotations are finalized, Bid Bond will be returned to suppliers with the exception of the successful suppliers to whom the Bid Bond will be returned after a Performance Bond is received.

8.    Performance Bond

    1. Performance Bond will be required from the successful supplier to a value of 10% of the total value on any purchase exceeding Rs. 250,000.00. Performance Bond should be valid for 90 days unless otherwise specified on award.
    2. The successful supplier on each quotation will be informed by way of Letter of Award (Applicable only to quotation where the value exceeds Rs. 100,000.00 and a Purchase Order for value less than 100,000.00) on receipt of the Letter of Award the successful supplier should make immediate arrangements to submit the Performance Bond.  And the bid bond will be released thereafter.
    3. In the event of the successful supplier failing to submit the Performance Bond after receiving the Letter of Award within the stipulated time, the Bid Bond will be forfeited if the supplier fails to supply the items within the delivery period to compensate for damages caused to the Board.
    4. On receipt of a Purchase Order/Letterof award, the successful supplier should comply with the requirements specified therein such as delivery of goods to the required specifications and standards. Failure on the part of the supplier to comply with these requirements shall constitute sufficient grounds for annulment to the Purchase Order and forfeiture of the Performance Bond.


9.    General Instructions

    1. All supplies should always conform to the International Standards and suppliers should indicate on the “Quotation Form”  the standard offered. Specific standards will be stipulated on Quotation Form wherever necessary. The National Water Supply & Drainage Board always expects the registered suppliers to quote for material, which conform to acceptable International Standard. Any material, which does not meet the standard set by this Board, will be rejected.
    2. In cases where samples are required and approved, the supplier should deliver the materials in strict accordance with the samples submitted by them.
    3. The deliveries must be made within the validity period stipulated on Purchase Order/Letter of award. Only on proven unavoidable circumstances the extension is required a letter must be forwarded to the Deputy General Manager (Supplies & Materials Management ) to that effect, prior to the lapsing of validity of order.
    4. Extensions will not be considered under any circumstances on Purchase Order where validity periods have already been extended more than thrice.
    5. Name of suppliers who fail to deliver material completely even after three extensions of validity are granted as per under 9 (d) above, in response of their request and at the discretion of the National Water Supply & Drainage Board, will be deleted from the Register of Suppliers. Names of Suppliers, who do not request extension, although delivery dates have lapsed on the orders awarded to them will be treated as defaulted Suppliers and will be deleted from the Register of Suppliers without notice.
    6. The suppliers who default, delay, dishonor the awards made by National Water Supply & Drainage Board or deliver inferior quality products on Purchase Orders will be blacklisted and their names will be intimated to all Government Institutions.
    7. In addition to the above General Instructions, the Board will apply further instructions any conditions as and when necessary wherever quotations are invited.


10.    Advance Payment

Supplier’s who offers credit facilities on the applications for registration but demand advance payment when Purchase Order are sent to them, will also be deleted from the Registration of Suppliers, if they fail to satisfactory reasons for their demand. However suppliers, may indicate their terms of payment for consideration at the time of quoting.

11.   Suppliers are requested to closely follow above rules and regulations in this Circular No : DGM/S/A1/18/2017. All registered suppliers are strongly advised that their quotations throughout the year 2017 shall be governed by the rules and regulations stipulated in this circular.

Yours faithfully
NATIONAL WATER SUPPLY & DRAINAGE BOARD


Deputy  General Manager (Supplies & Materials Management )